Master Construction meter box 125A (2x63A 3x32A 6x230V) KEMA KEUR
De Master construction site meter cabinet – maximum power and flexibility
The Master construction meter cabinet is the most robust and indestructible solution in our range. Thanks to its spacious layout and modular design, this cabinet can be fully configured to your wishes, including additional site office and underground cable groups, power groups, and specific connection combinations.
Whether for construction sites, industrial applications, or temporary power supplies: the Master delivers maximum flexibility without compromising on quality and sustainability.
Some advantages:
✅ KEMA/DEKRA approved
✅ Suitable for custom solutions
✅ Ideal for heavy-duty applications
✅ BOS quality: impact-resistant plastic housing, solid hinges and locks, safe and durable
Master 125 Amp. meter cabinet KEMA/DEKRA consisting of:
The meter room can be connected via a plastic conduit and can be locked with a toggle lock or padlock.
The distribution unit can also be locked using toggle locks.
Equipped with 4-pole 125A main switch
Power 1: 2 flush-mounted sockets 5-pin 63A protected by 1 circuit breaker 40A and 1 residual current device 63A 0,3A per socket.
Power 2: 3 flush-mounted sockets 5-pole 32A protected by 1 32A circuit breaker per socket. The 32A power circuits are earth leakage protected by 1 63A 0,03A residual current circuit breaker and upstream protected by 1 63A circuit breaker.
Lighting: 6 flush-mounted sockets 2-pole + earth 16A protected by 1 16A circuit breaker per 2 sockets. The 16A lighting circuits are earth-protected by 1 40A 0,03A residual current circuit breaker.
Standard: anchorable heavy galvanized steel frame.
- Made of impact-resistant plastic with a thickness of approx. 10 mm.
- Dust and water resistant IP44
- Sockets on the inside of the cabinet, easy to replace if necessary.
- The inner panel is also interchangeable.
- Fully lockable.
- The Master is tested and delivered with a comprehensive test report.
Bos meter and distribution cabinets are extensively tested under full load in accordance with the European standard EN 61439-4. This standard ensures safe electrical installations at construction sites. Using our modern testing equipment, we test for all possibilities, from high voltage to leakage current testing. After this test, every meter and distribution cabinet receives a unique and comprehensive test report, which can be downloaded anywhere via a scannable QR code.
